Novia Methane Pro High Performance Gas Barrier Membrane 1.6m x 50m Roll
Novia Methane Pro High Performance Gas Barrier Membrane 1.6m x 50m Roll
Guide Price: £212.12 (£254.54 inc VAT)
- Product Code: A1-2447
- Delivery Time: 1 - 2 days
- Brand: Novia (Tech. support: 01622678952)
- Model and Size: 1.6m x 50m
- Weight: 27.00kg
Our ratings on 22-11-2024:
4.7 out of 5 - Excellent
4.8 out of 5
Novia Methane Pro High Performance Gas Barrier Membrane 1.6m x 50m Roll
Width: 1600mm
Weight: 27kg
Novia Methane Pro Novia Methane Pro High Performance Gas Barrier Membrane is a premium specification multi-layer laminate membrane incorporating reinforcement and an aluminium foil core for use as a methane and CO gas barrier in groundwork applications. It can also be used in radon gas barrier and damp proof membrane applications. It is compliant for BS 8485:2015 requirements. Novia Methane Pro is CE approved as a damp proof membrane. Novia Methane Pro membrane joints must be professionally installed in conjunction with Novia 2-tape sealing system to ensure a fully compliant gas tight seal.
CHARACTERISTICS
- BS 8485:2015 compatible methane and CO barrier,
- Tough, tear-resistant and reinforced material,
- Easy to install loose-laid membrane,
- Easy visual check - ensure no blue colour showing,
- Multi-layer virgin polythene laminate with an aluminium foil core,
- Extremely low vapour and methane permeability,
- Also acts as a radon barrier and DPM,
- Sheets and joints tested to ISO 15105-1,
- CE Approved and CPR compliant,
- Complies with BS EN 13967 Type A DPM.
APPLICATION
- Methane, Radon and CO gas barrier in groundwork applications
INSTALLATION
- Ensure the surface is dry and dust free before unrolling the first piece of membrane.
- Once the membrane is flat, apply the 50mm double-sided butyl tape approximately 50mm from the edge and temporarily leave the backing paper on.
- Prepare the top section of methane barrier by once again ensuring the surface underneath is dry and dust free.
- Then lay this section of membrane with a 150mm overlap onto the first section and join them together by peeling off the backing paper of the double sided butyl tape and pressing them very firmly together.
- Where the two membrane joints overlap, the excess must be held in place using Novia BOPP lap sealing tape.
- Carefully apply Novia BOPP tape equidistant over the edges of the two membranes ensuring there are no wrinkles or gaps and then apply firm pressure to complete the seal.
- All other edges and entry points must be sealed in the same manner.
- Any damage or patches must also be sealed using the same techniques.
- Always reapply any tapes that are not 100% correctly sealed. Once installation is complete, the gas barrier should be protected as soon as possible to prevent any accidental damage.
Note: This membrane is not suitable forapplications where hydrostatic pressure is present.
CERTIFICATION